We install the first two Nacelle Panels onto our Pylon Skeleton and assemble a new lower Deck Panel in Stage 66!
Monthly Archives: August 2023
Stage 65
Another lower Deck Panel is built and installed (with lighting) onto our saucer Lower Skeleton Frames as we complete Stage 65!
Stage 64
Two Side Panels (latches) are installed on our new Nacelle Pylon Skeleton and we add a Phaser Array to our Deck Panel with Stage 64!
Stage 63
In Stage 63, we add two more Supports to our Battle Section and assemble another lower saucer Deck Panel!